Banner

Optical Specifications, Fabrication, and Testing

                                                                                           

 

OPTI 415/515 

Optical Specifications, Fabrication, and Testing

 

Fall, 2009

 

Class: T/Th at 12:30 - 1:45 in Meinel 307 (this is different than the course listing from Optical Sciences)

 

 

Instructors

Prof. Robert Parks

rparks@optics.arizona.edu

Room 106A Meinel Bldg.  

Phone:  621-4180

Office hours: By appointment

 

Prof. Bill Kuhn

bkuhn@optics.arizona.edu

Office:

Phone:

Office Hours: Th after Class

 

Prof. Jim Burge

jburge@optics.arizona.edu

Room 733 Meinel Bldg.

Phone: 621-8182

 

Teaching Assistant

 James Johnson

jjohnson@optics.arizona.edu

Room 300 Meinel Bldg.

520-621-7302

Office Hours: Wed 1:30-2:30

           

       

 

Course Introduction / Syllabus

 

Textbooks and References:

Link to Fab&Test References

 

Malacara, Daniel, Optical Shop Testing, 3rd Ed. (Wiley Inter-science 2008).  (Recommended)

Karow, Hank H., Fabrication Methods for Precision Optics (Wiley Inter-science 1993). (Recommended)

Warren Smith, Modern Optical Engineering (McGraw-Hill 2007) (Recommended)

Additional references supplied on a CD, which will be handed out.

 

Distance Learning

Video stream at: http://www.optics.arizona.edu/distance/Fall2009.htm  (need username and password).

Handled by Cindy Robertson <cindyr@optics.arizona.edu> (520) 626-4719

Homework submission for DL students

 

Lectures:

Class notes are available for download here.

Classes are recorded on DVD and can be viewed by checking out the DVD from the Optical Sciences library or by downloading the video from http://www.optics.arizona.edu/distance/Fall2009.htm

 

Review sessions:

We plan to offer review sessions on Thursdays after class.  These may be available for DL students as well

 

Posted grades for 415

Posted grades for 515 (on-campus students)

Posted grades for 515 (off-campus students)

 

(Grades are posted according to a Personal ID#.  If you wish to have your grades posted, then send an email with your name and a 4-digit ID# to fab&test@optics.arizona.edu)

 

 

Homework:

Homework is due the following Friday by 5pm from when the assignment is given (DL students have a one week grace period).

They can be dropped off in James Johnson's mailbox located in the Meinel Mailroom.

 

Requirements for Graduate Credit (OPTI 515)

    Tutorials (link to student reports)

    Test Plans (link to student reports)

Scoresheet for presentations
Presentation Videos (Note These include both 515 & 521 presentations)

 

UA policy on Academic Integrity

 

 

Class Calendar

DL

 

Class

Preparation Material

Assignment
(Due dates for DL students are one week later than indicated here.)

 

Week 1

 

 

 

 

1

T: Aug. 25

Welcome to OPTI 415/515

Indroduction from Prof. Parks

 

 Optical Systems

Review Paraxial Optics (Smith Ch. 2, Fischer Ch. 1)

 

 HW#1 Assigned (Due 9/4/09)

Solutions

2

 Th: Aug. 27

Thickness, Radii, Index

 

 

Measurement of EFL/Distortion

Ch 1. Paraxial Properties, (Wyant)

Ch 2. QualOfOpticalMaterials,  (Wyant)

NofzigerNodalSlide

 

 

Week 2

 

 

 

 

3

T: Sept. 1

Intro to Aberrations and Image Quality Metrics

 

PSF, MTF, Encircled Energy

Spatial Frequency Response(SFR)

3.1 Basic Aberrations and Testing I-IV, VIII, IX(Wyant)

 

Updated (9/2):

HW#2 Assigned (Due 9/11/09)

Solutions

Alternate Solutions

 

 

4

Th: Sept. 3

Diffraction Limit and Its Relation to Wavefront

 

 

 

Zernikes and their relation to Aberrations

 

rmsZernike.doc

PVZernikes.doc

 

Review/Recitation Video

3.1 Basic Aberrations and Testing VI-XII(Wyant)

 

 

Th: Sept. 3

Review session

 

 

 

F: Sept. 4

 

 

 

HW #1 Due

 

Week 3

 

 

 

 

5

T: Sept. 8

Intro to Interferometry and Fringe Pattern Interpretation

Ch 4.1 – Basic interferometry and optical testing

 

test plate.wmv

 

Shear plate

Ch 8.9 shearing interferometry pg 1-11

 

shear plate.wmv

 

Orthogonality and data fitting

Orthoscript1.m, VarianceScript1.m

 

A cookbook approach to linear, least-squares fitting in Matlab.doc

Cookbookfitting1.m,

HW #3 Assigned (Due 9/18/09)

(Revised 9/14)

Solutions

Alternate Solutions

 

6

Th: Sept. 10

More Types of Interferometers:

Shack Cube

Interference Objectives

Introduction to phase shift interferometry

 

Outcomes/Objectives

 

 

Sufficient understanding to choose a reasonable interferometer type for the application, ability to recognize problems in measured data and to identify possible problems in measurement setup.

Vibration compensated interferometry

Ch5.4 vibration compensated - abbreviated (Wyant)

 

 

 

 

T: Sept. 10

Review Session Video

 

 

 

 

F: Sept. 11

 

 

 

HW#2 Due

 

Week 4

 

 

 

 

7

T: Sept: 15

Alignment

Effects of Misalignment

 

HW#4 Assigned (Due 9/28/09)

 

Solutions

 

8

Th: Sept. 17

Stray Light, Coatings

 

 Ch 11.1 System Evaluation

(Wyant)

 

ISO 14490-6

 

 

Th: Sept. 17

Review session video

 

 

 

 

F: Sept. 18

 

 

 

HW#3 Due

 

Week 5

 

 

 

 

9

T: Sept 22

Exam  #1
Review material for Exam #1

(Note: You will be allowed a 1 page crib sheet)

Solutions

 

 

10

Th: Sept. 24

Non-interferometric wavefront testing (Wyant)

 

 

Reduction of wavefront slope data

Movies showing SH WFS

 

References:

Malacara 8.2, 8.3, 9.2, 10.1-10.8,

Southwell paper

 

readme file for matlab program

polyfun110321b.m

slope36x.m

slope36y.m

suHartmannPolynomialFitting0928.m

suHartmannSouthwellLeastSquare0928.m

 HW 5 assigned(Due 10/5/09)

 

Solutions

 

Th: Sept. 24

Review session Video

 

 

 

 

Week 6

 

 

 

 

 

M: Sept. 28

 

 

 

HW#4 is Due

11

 T: Sept. 29

ISO Optical Standards

Environmental Standards

 

 

 

12

 Th: Oct. 1

 ISO Drawing Standards

 

 

ISO 1011, 10110, 5460

 MIDTERM REGRADE RULES (Due 10/8)

 

 Th: Oct. 1

Review Session Video

 

 

 

 

Week 7

 

 

 

 

 

M: Oct. 5

 

 

 

HW#5 Due

13

 T: Oct. 6

Intro to Fabrication

 

Example optical system

New class example 7 with fold C.zip

(updated 9/13/09)

Flat mirrors

Karow p. 381-410, 442-463, 609-644

 

HW 6 assigned (Due 10/14/09)

Example system prescription correct one.pdf

(note: This prescription will help for CodeV users)

 

Solutions
 

14

 Th: Oct. 8

Testing Flats

 

Karow p. 463-492, 672-701
ISO 9211

 

 

 

Review Session Video
 

 

 

Week 8

 

 

 

 

15

 T: Oct. 13

Fab and testing issues for spherical mirrors

 Optical materials

 

Schott & Ohara Catalogs

 

16

 Th: Oct. 15

Optical Windows Defects

 AR Coatings

ISO 9211, Karow p 503-505

 

 

Th:

Review Session Video

 

 

 

F: Oct. 16

 

 

 

HW 6 Due

HW#7 Assigned
(Due 10/26/09)


Solutions
 

 

Week 9

 

 

 

 

17

T: Oct. 20

Optical Window Fabrication

Testing Transmitted Wavefront

Fynn & Powell p. 40-74

 

18

Th: Oct. 22

Prism specification, fab & test

 

Lens specification and fabrication

 

ISO 10110, 9022, 11382

 

 

Oct. 22

Review Session Video

 

 

 

 

Week 10

 

 

 

 

 

M: Oct. 26

 

 

 

HW 7 Due

19

T: Oct. 27

Prism Specification

Prism Measurement

Karow p. 386-389, Smith Ch. 4, Malacara Ch. 17

 

20

Th: Oct. 29

Lens specification, tolerancing  fabrication
(Rick Plympton, Optimax)

 

 Tutorial reports due

 

HW 8 Assigned (Due 11/6/09)

 

Solutions

 

Week 11

 

 

 

 

21

T: Nov. 3

Lens Tolerancing

Doublets

Karow p. 506-551

 

22

Th: Nov. 5

Assembly Alignment

Aspheric Specifications

ISO 10110, Karow p.551-560

 

 

Th: Nov. 5

Review Session Video
 

 

 

 

F:
Nov. 6

 

 

 

HW 8 Due

 

Week 12

 

 

 

 

23

T: Nov. 10

Exam #2

Review Info for Exam #2

Solutions

 

 

24

Th: Nov. 12

Fabrication of Aspheres

Testing During Fabrication

Skim Optics Cooke Book (Fantone)

 

 

Th:
Nov. 12

Review Session has been cancelled. We will discuss the exam next week.

 

 

Week 13

 

 

 

 

25

T: Nov. 17

Null Optics and CGHs

Asphere Testing

Skim Malacara Ch. 8, 9, 10, 12

MIDTERM REGRADE RULES (Due 11/24)

HW 9 Assigned(Due 11/24)

Solutions

  W: Nov 18 Note: James' Office hours have moved again 10:30-11:30am      

26

Th: Nov. 19

Asphere Modelling

Assembly of Systems

Read ISO 10110, Zemax Manual Ch. 11

 

  Th: Nov 19 Review Session Video  

 

Week 14

 

 

 

 

27

T: Nov. 24

Slope Measurement Tests

Alignment Cont'd

 

 Exam 2 Regrades Due

28

Th: Nov. 26

Thanksgiving Holiday

 

 

 

Week 15

 

 

 

 

29

T: Dec. 1

System Tests, Stray Light

Diagnostic Tests

 

 

30

Th: Dec. 3

Centered System Assembly

Overview of Other ISO Standards

Skim ISO 9022, 10109

 

    Review Session  

 

Week 16

 

 

 

 

31

T: Dec. 8

Course Review

Final Review Questions

Final Review Questions #2

 

 

  T: Dec. 15 FINAL EXAM!!

11 am
ROOM 307

 

 

 

 

Useful Links

 

 

(Please send comments, suggestions, or dead links to fab&test@optics.arizona.edu)

 

Last update 12/18/2009 03:39:32 PM