
Optomechanical Engineering
520-621-8182
Spring 2009
|
Prof. Bob Parks Optomechanics
Laboratory Meinel 106A 621-4180 |
Prof. office : 621-8182 Room 733 Meinel Bldg |
UA policy on Academic Integrity
Part 1 : Group projects:
|
Group Projects |
Discussion |
References |
|
|
|
|
|
CMM |
|
|
|
Total station - theodolite |
|
|
|
Fiber connectorization |
|
|
|
Drill, tap and de-burr a hole |
|
|
|
Assemble lenses in a cell |
|
|
|
Laser tracker |
|
Part 2 : Individual projects:
Spr09/523L/Candidate projects for 423L.pdf
|
Students |
Resume |
Project title (Provisional) |
Initial Project Review data |
Final Report |
|
John |
Mirror
mounting - macro effects of cementing |
2/19 |
||
|
Wenrui |
Lens mounting
and contact stresses |
2/10 Spr09/523L/Group Projects/Hardware I got_03-09-09_Wenrui Cai.pdf |
|
|
|
Amber |
Baffles and
stray light control |
2/12 Spr09/523L/Group Projects/Czaikowski 523L_Preliminary Design Review.pptx |
|
|
|
Gerard |
Containment
of liquid in liquid lenses |
2/19 Spr09/523L/Group Projects/Containment of Liquid in Liquid Lenses - Preliminary Project Review.pptx Spr09/523L/Group Projects/Containment of Liquid in Liquid Lenses - Initial Project Review.pptx |
|
|
|
Chris |
Video
eyepiece for alignment telescope |
2/17 Spr09/523L/Group Projects/Preliminary Design report Chris and Adam.pdf |
|
|
|
Adam |
Alignment of
optics in 3-D space |
2/17 Spr09/523L/Group Projects/Preliminary Design report Chris and Adam.pdf |
|
|
|
|
Swing arm
profiler design and fab |
2/10 |
|
|
|
Tianquan |
Mirror
mounting - localized effects of cementing |
2/12 |
|
Reference
material |
Applicable
Projects |
|
|
Cementing and
Mounting Technologies for Optics SPIE Course |
John and
Tianquan |
|
|
OSA ISO 10110
User's Guide - General Reference to ISO 10110 |
Optical
Drawings |
|
|
Class talk
2-24-09 |
|