Banner

Optomechanical Engineering

Prof. Jim Burge

jburge@optics.arizona.edu

520-621-8182

Back to Home

OPTI 523L

Optomechanical Engineering Laboratory

 

Spring 2009

 

Prof. Bob Parks

rparks@optics.arizona.edu

 

Optomechanics Laboratory

Meinel 106A

621-4180

Prof. Jim Burge

jburge@optics.arizona.edu

office : 621-8182

Room 733 Meinel Bldg

 

 

 

Course introduction

 

UA policy on Academic Integrity

 

 

 

Part 1 : Group projects:

Group Projects

Discussion

References

List of Group Projects

 

 

    CMM

 

Spr09/523L/Group Projects/Square for CMM.doc

    Total station - theodolite

Leica Builder Total Station

 

 

Spr09/523L/Group Projects/Leica Surveying made easy.pdf

    Fiber connectorization

 

Spr09/523L/Group Projects/Fiber connectorization manual.pdf

    Drill, tap and de-burr a hole

 

 

    Assemble lenses in a cell

 

 

    Laser tracker

 

Spr09/523L/Group Projects/SA User Manual.pdf

Spr09/523L/FARO User Manual.pdf

 

 

Part 2 : Individual projects:

 

Spr09/523L/Candidate projects for 423L.pdf

 

Students

Resume

Project title (Provisional)

Initial Project Review data

Final Report

John

John Armstrong

Mirror mounting - macro effects of cementing

2/19

 423L - Final Report - Armstrong

Wenrui

Cai Wenrui

Lens mounting and contact stresses

2/10

Spr09/523L/Group Projects/Hardware I got_03-09-09_Wenrui Cai.pdf

 

523l_final report_Wenrui Cai

Amber

Professional Resume

Baffles and stray light control

2/12

Spr09/523L/Group Projects/Czaikowski 523L_Preliminary Design Review.pptx

Spr09/523L/Group Projects/Czaikowski 523L_Requirements.pptx

 

OPT523L-A.Czajkowski_Rev.B

Gerard

Spr09/523L/Group Projects/Resume G Desroches.pdf

Containment of liquid in liquid lenses

2/19

Spr09/523L/Group Projects/Containment of Liquid in Liquid Lenses - Preliminary Project Review.pptx

Spr09/523L/Group Projects/Containment of Liquid in Liquid Lenses - Initial Project Review.pptx

 

Containing Liquid in Liquid Lenses final report-1

Chris

Spr09/523L/Group Projects/Resume_Christopher Guido.pdf

Video eyepiece for alignment telescope

2/17

Spr09/523L/Group Projects/Preliminary Design report Chris and Adam.pdf

 

423L Report-2 Chris - Adam

Adam

Adam Myrick

Alignment of optics in 3-D space

2/17

Spr09/523L/Group Projects/Preliminary Design report Chris and Adam.pdf

 

423L Report-2 Chris - Adam

Colton

Colton Noble

Swing arm profiler design and fab

2/10

Swing Arm Project, Progress and Objectives

 

Swing arm Final Report

Tianquan

Tianquan Su

Mirror mounting - localized effects of cementing

2/12

Spr09/523L/Group Projects/Tianquan Su_Experiment Plan.pdf

523 R & L Final Report_Tianauqn Su

   

 

 

Reference material

Applicable Projects

 

Cementing and Mounting Technologies for Optics SPIE Course

John and Tianquan

Spr09/523L/Group Projects/SPIE Cementing Course notes.pdf

OSA ISO 10110 User's Guide - General Reference to ISO 10110

Optical Drawings

Spr09/523L/Group Projects/ISO10110 User's Guide.pdf

Class talk 2-24-09

 

Specification using ISO 10110